2007 Learjet 40

TOTAL TIME: 3,163.6 HOURS | 2,858 CYCLES

AVIONICS

  • Honeywell Primus 1000 Avionics System

  • Honeywell 4-tube 7×8-inch displays with DU-870

  • Dual LITEF LCR-93 AHRS

  • Dual Universal UNS-1E with Dual GPS

  • Dual Honeywell RNZ-851 Integrated Navigation Units

  • Dual Honeywell RCZ-833K Comm Units with 8.33 spacing

  • Honeywell Mark V EGPWS with windshear and terrain display

  • Honeywell TCAS-2000 with Change 7

  • Honeywell KHF-950 with Coltech CSD-10 SELCAL

  • Honeywell RT-300 Radio Altimeter

  • Mode S with enhanced surveillance

  • Honeywell Primus 660 Color Radar

ENGINE DETAILS

  • Honeywell TFE731-20AR-1B

  • Engine 1: 3,163.6 Hours Since New

  • Engine 2: 3,163.6 Hours Since New

  • 2,858 Cycles

  • TBO: 5,000 Hours

ADDITIONAL DETAILS / UPGRADES

  • Universal CVR 30

  • EICAS

  • Dual Honeywell AZ-950 Air Data Computers

  • Honeywell Multi-Function Display

  • Dual Honeywell DA-800 Digital Acquisition Units

  • Dual IC-600 Autopilot Computers

  • Clearance Delivery Radio

  • Artex C406-2 MHz ELT

  • Dual Davtron M850 Chronometers

  • Airshow 410

  • Forward LS Bulkhead Mounted 10.4-inch LCD Monitor

  • Cabin Entertainment System with 10-disc CD changer and DVD

  • 110 VAC Outlets

  • External Baggage Compartment

  • Keith Products Vapor Cycle with Auxiliary Heat

  • 38 AHR Lead Acid Main Batteries

  • Recognition Pulse Lights

INTERIOR

  • 7 Passenger Executive Configuration

  • Light Brown Leather Seating with darker vertical accent welting

  • One Executive Club Seat

  • Cream Ultra-Leather Headliner and Sidewalls

  • Gold, Brown, and Beige Speckled Loop Carpeting

  • Forward Galley with Warming Oven

  • Galley Rest Seat

  • Medium Dark Straight-Grain Wood Veneer with Matte Finish

  • Dual Executive Foldout Tables

  • Aft Lavatory

EXTERIOR

  • Matterhorn White with Sunfast Red and Medium Gold Metallic Accent Stripes

  • Completed by Bombardier Completion Center,

  • Wichita, KS — January 2007

MAINTENANCE

  • Phase A (300H / 12M) complied with 05/2026.

  • Phase B (600H / 24M) complied with 2,900.6 H on 05/20/2025; next due 3,500.6 H / 05/20/2027.

  • Phase C (1,200H / 48M) complied with 2,494.0 H on 04/11/2023; next due 3,694.0 H / 04/11/2027.

  • Phase D (2,400H / 96M) complied with 2,494.0 H on 04/11/2023; next due 4,894.0 H / 04/11/2031.

REQUEST MORE INFORMATION AND DOWNLOAD TECHNICAL SHEET